Holistic Thermal Assessment and Control Of The Artificial Ground Freezing For The New Underground Station "Museum Island " in Berlin
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a length of about 106 m (347 ft) under the protection of a major ground freezing measure and crossed the Spree canal as well as the listed castle bridge. The approximately 20,000 m³ (4.54 E+06 US gal dry) frozen mass lay mainly in the Berlin sands. In order to ensure safe tunnelling and to protect the adjacent buildings, the planners had defined requirements for the mean freezing temperature and thickness of the frozen mass. For a reliable conclusion on the dimensions of the frozen mass, we used innovative temperature sensors as well as the new, web-based 3D measurement visualization and the associated site-specific evaluation software. The largely automated evaluation enabled a quick and reproducible determination of the temperature distribution in the frozen soil and its thickness in the relevant cross-sectional areas. The measurements were validated by thermal calculations using the Finite-Element-Method. Thus, an objective and clear assessment basis was available to ensure rapid coordination between stakeholders. The evaluations provide new insights into the temperature influences from tunneling, the application of shotcrete and the concreting of the inner shell. The newly implemented active thawing system is also an interesting innovation.
Joachim; Dipl.-Ing. Joachim Meier; Jakob Vogelsang
International Conference Proceedings
Powered By